GlobalFoundries will operate up to two new chip fabs at its Malta, New York, site under a U.S.-Japan initiative providing up to $21 billion, with Japan supplying the money. The first fab, about $10 billion, is due online in 2029; a second, about $10 billion more, is still subject to approval.

Correction (Oct 14): An earlier version described a reported $21 billion deal for two New York fabs. GlobalFoundries announced the up-to-$21 billion U.S.-Japan initiative itself; the first fab (about $10 billion, online in 2029) is set, and the second is still subject to approval.
Governments own the fabs while GlobalFoundries runs them.
The deal creates new competition for Taiwan foundries.
Tap a lens to see what this story means for you.
Liked this? The Brief brings you the whole day in tech, verified, every morning.
Two minutes, free forever. What's in The Brief →
See what’s happening right now
The Feed runs all day — short, verified briefs the moment they break.
Open the FeedFollow @thecircuitry_
Every story we publish, as it happens. No noise between.
Reader-supported
The Circuitry is a passion project I've always wanted to build, and I love the work behind it.
Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.
Any contribution is appreciated. If not, no pressure. Thanks for reading.
Sources told CNBC that Chinese AI lab Moonshot has discussed leasing Nvidia Blackwell capacity from European neoclouds, including talks around clusters of 8,000 or more GPUs. No signed lease has been confirmed.
Semiconductor Engineering's week in review: HBM smuggling into China, roughly 600,000 Nvidia H200s held in Hong Kong, a reportedly paused Micron Taiwan plant, and Oracle's reported cancelation of a ~$7B Tencent chip-access deal.
Powerchip Investment Holding filed a criminal complaint on Nov. 2 over an alleged coordinated bid to buy a 20% stake for more than NT$13.6 billion. The filing raises questions about compliance with tender offer rules and the origin of the funds.
AUO's board approved selling its Taichung Plant Phase II buildings, cleanrooms and facility equipment in Xitun District to TSMC for NT$38.8 billion (about US$1.2 billion) before tax, per AUO's TWSE material-information filing as reported by TechNews and DigiTimes. AUO expects a disposal gain of about NT$18.5 billion, with payment in installments under the property contract. Separately, AUO ended a planned NT$19.7 billion sale of its Huaya site to Quanta because the two sides could not agree on specs and delivery timing.
Patent filings analyzed by SemiAnalysis show ASML developing a die-to-wafer hybrid bonder for advanced packaging. The move positions the lithography leader against Besi and other suppliers as chipmakers seek growth beyond transistor scaling.