The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
HOMETODAYNEWSFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • EV Group says it will show quantum-chip tools in Munich this weekTech
  • Ford says 2021 Mach-E batteries kept 92 percent health on averageTech
  • Google adds TPU 8tx and TPU 8i Max to its chip lineupTech
  • BMW contracts Samsung SDI and LG for Gen6 battery cellsTech
  • Starbase notice says SpaceX proposes a $24 billion plant and compute siteTech
  • Iris Plaza says about 7.7 million customer records may have leakedSecurity
  • Nvidia plans investments in four Korean startups across AI infrastructure and modelsTech
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source

via Deutsche Telekom

Deutsche Telekom · track record
2Stories
100%Verified
230d
All sources →
Markets
NVDA···

Live quote · not investment advice

Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Tech/Deutsche Telekom expands its Munich AI factory with NVIDIA Blackwell Ultra GPUs
VERIFIEDBy Xavier Rivera·Monday, November 9, 2026 at 6:26 AM AST·1 min read

Deutsche Telekom expands its Munich AI factory with NVIDIA Blackwell Ultra GPUs

Deutsche Telekom announced it will expand its Munich AI factory with NVIDIA Blackwell Ultra B300 systems, doubling the site's chip count and raising power capacity to 20 megawatts.

Source:Deutsche Telekom
Post
Deutsche Telekom expands its Munich AI factory with NVIDIA Blackwell Ultra GPUs
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Deutsche Telekom is investing nearly another quarter of a billion euros to expand its Munich AI factory with NVIDIA Blackwell Ultra B300 GPUs, doubling the site's chip count and raising its power capacity to 20 megawatts.

Tim Höttges announced the expansion at a press conference in Munich on November 9. The AI factory at Tucherpark will add NVIDIA Blackwell Ultra Generation (B300) systems alongside its existing NVIDIA Blackwell B200 installations. The new chips will double the number of B-class GPUs at the site, and the facility will also continue deploying NVIDIA RTX PRO 6000 Blackwell Server Edition GPUs.
Germany must not only be a user of AI; it must also create value and prosperity itself.
Telekom said it is investing nearly another quarter of a billion euros to support the expansion, which will raise the AI factory's power capacity to 20 megawatts. The Industrial AI Cloud first went live in February 2026 and its initial expansion phase sold out within seven months. Companies including Siemens and Daimler Truck are already using the infrastructure.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
Höttges said the factory can simulate virtual environments to test robots, products or production facilities under realistic conditions, cutting tasks that would take weeks or months down to hours.

The company is also exploring a further expansion of its commitment in Bavaria.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
The first expansion raised AI capacity in Germany by 50 percent. The AI factory's initial buildout included nearly 10,000 NVIDIA Blackwell GPUs across DGX B200 systems and RTX PRO Server GPUs, delivering up to 0.5 exaflops of computing power with a power usage effectiveness ratio of 1.2.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More fromDeutsche Telekom
  • Deutsche Telekom raises guidance, plans 1.10 euro dividend

    Markets · 4d
More inTech
  • Iris Plaza says about 7.7 million customer records may have leaked

    Tech · 2h
  • Nvidia plans investments in four Korean startups across AI infrastructure and models

    Tech · 4h
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Tech →
  • Tech·Nov 9

    EV Group says it will show quantum-chip tools in Munich this week

    EV Group says it is supporting quantum-chip makers with packaging and bonding tools, and will show them at SEMICON Europa in Munich from November 10 to 13. The release names no new contract value or ship date.

  • Tech·Nov 9

    Ford says 2021 Mach-E batteries kept 92 percent health on average

    Ford says 2021 Mustang Mach-E batteries have kept 92 percent of their health on average after five years. The reading covers more than 36,000 vehicles and is dated August 2026.

  • Tech·Nov 9

    Google adds TPU 8tx and TPU 8i Max to its chip lineup

    Google says it is adding TPU 8tx for confidential inference and TPU 8i Max for long context. TPU 8i Max pairs two TPU 8i chips and doubles that chip's compute, SRAM and memory bandwidth.

  • Tech·Nov 9

    BMW contracts Samsung SDI and LG for Gen6 battery cells

    BMW says it has contracted Samsung SDI in Europe and LG Energy Solution in the US to supply sixth-generation battery cells from the late 2020s. The cells will come from existing plants.

  • Tech·Nov 9

    Starbase notice says SpaceX proposes a $24 billion plant and compute site

    A City of Starbase notice says SpaceX proposes a gas-fired power plant and a super-compute facility, with about $24 billion for the initial phases. The city will consider a tax abatement on December 9. Nothing has been approved.