The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
HOMETODAYNEWSFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • IEA says the oil market returns to a surplus this quarterEnergy
  • Archrock agrees to buy HiVolt for up to $450 millionEnergy
  • Rowan adds more than $1.5 billion in data center financingEnergy
  • EIA forecasts Alaskan crude oil production to grow 13% in 2027Energy
  • NRC issues first gas-cooled reactor permit in nearly 60 yearsEnergy
  • Statnett pauses new data-center grid reservations until 2027Energy
  • A report says a 31 megawatt solar farm in Australia is at full outputEnergy
  • A report says Latvia's 174 megawatt Tume solar farm is operatingEnergy
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Energy/Revolta commissions its first 10 kWh sodium-ion home battery
VERIFIEDBy Xavier Rivera·Thursday, November 5, 2026 at 9:02 AM AST·2 min read

Revolta commissions its first 10 kWh sodium-ion home battery

Revolta has installed a 10 kWh sodium-ion home battery near Aschaffenburg, Germany, and lists the modules at 599 euros each.

Source:ESS News
Post
Revolta commissions its first 10 kWh sodium-ion home battery
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Revolta has commissioned its first customer sodium-ion home battery, a 10 kWh system near Aschaffenburg. The company lists 599 euros per 2 kWh module and says 2026 units are sold out.

Morning Brief

Get the daily Energy brief

Every morning, in your inbox. What's in The Brief →

Revolta has installed and commissioned its first customer sodium-ion home battery near Aschaffenburg, Germany. The Frankfurt company calls the job the start of a commercial launch, and says the rollout is still a pilot.

The system is five modules and 10 kWh. The high-voltage pack runs at a nominal 450 V and uses five modules for a combined 10 kWh. The property already has about 20 kW of solar and a small hydro plant in a former mill. Revolta said the owner had been waiting for a sodium-ion battery, and gave greater energy independence as the reason.
The company lists 599 euros per 2 kWh module and 2,995 euros for the 10 kWh module set.

The data sheet sets the module specs. Each 2 kWh module weighs 18.7 kg, has IP64 protection, and uses three cells. The cells charge and discharge at 0.4 C, which the report describes as a 2.5-hour duration. Published energy density is 141 Wh per liter and 107 Wh per kilogram. The install uses an SMA inverter. The company's announcement did not give a rated power, a cycle life, or an efficiency figure.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
More pilot sites are planned in the coming weeks. Revolta said it will put systems at selected customer sites across Germany. Pilot customers get a measuring device at no charge so the company can collect daily operating data for its battery management system and firmware.

The list price is separate from the announcement. The company lists 599 euros per 2 kWh module and 2,995 euros for the 10 kWh module set. That price does not include the rest of the equipment needed for an installation. Revolta said it is sold out for 2026 and is taking reservations for 2027, with priority for people who make a down payment.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
A state grant is for a different project. The report says Revolta was granted funding a few weeks ago from the European Regional Development Fund through the German state of Hesse. The money is for a project the company describes as a highly efficient AC salt battery. The report does not give the grant amount.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inEnergy
  • Statnett pauses new data-center grid reservations until 2027

    Energy · 4d
  • A report says a 31 megawatt solar farm in Australia is at full output

    Energy · 4d
  • A report says Latvia's 174 megawatt Tume solar farm is operating

    Energy · 4d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Energy →
  • Energy·Nov 13

    IEA says the oil market returns to a surplus this quarter

    The IEA's November report says global oil supply has moved above demand for the first time since the war in Iran began. It expects a surplus in the fourth quarter of 2026 and a larger build in 2027.

  • Energy·Nov 13

    Archrock agrees to buy HiVolt for up to $450 million

    Archrock has agreed to acquire HiVolt Energy Holdings in an all-cash deal the companies value at up to $450 million. The filing sets a $415 million cash price at close, plus an employee incentive plan of up to $35 million, and expects the merger in the first quarter of 2027.

  • Energy·Nov 13

    Rowan adds more than $1.5 billion in data center financing

    Rowan Digital Infrastructure has added more than $1.5 billion in corporate financing for its U.S. data center pipeline. The capital is for early work across 5.5 gigawatts, and more than 1.2 gigawatts is already under contract.

  • Energy·Nov 12

    EIA forecasts Alaskan crude oil production to grow 13% in 2027

    The EIA forecasts Alaskan crude oil production will rise 13% in 2027, to 505,000 barrels a day, the most since 2014.

  • Energy·Nov 10

    NRC issues first gas-cooled reactor permit in nearly 60 years

    NRC has granted Long Mott Energy a construction permit for a station in Calhoun County, Texas, and says a high-temperature gas-cooled reactor has not received one in nearly 60 years.