The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
HOMETODAYNEWSFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
  • IEA says the oil market returns to a surplus this quarterEnergy
  • Archrock agrees to buy HiVolt for up to $450 millionEnergy
  • Rowan adds more than $1.5 billion in data center financingEnergy
  • EIA forecasts Alaskan crude oil production to grow 13% in 2027Energy
  • NRC issues first gas-cooled reactor permit in nearly 60 yearsEnergy
  • Statnett pauses new data-center grid reservations until 2027Energy
  • A report says a 31 megawatt solar farm in Australia is at full outputEnergy
  • A report says Latvia's 174 megawatt Tume solar farm is operatingEnergy
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Energy/Return reportedly secures €835 million for German battery projects
VERIFIEDBy Xavier Rivera·Thursday, November 5, 2026 at 12:31 PM AST·1.5 min read

Return reportedly secures €835 million for German battery projects

Return has reportedly secured €835 million, about $936 million, in portfolio financing from Deutsche Bank and Rabobank for battery storage in Germany. The framework covers three projects totaling 117 MW.

Source:ESG Today
Post
Return reportedly secures €835 million for German battery projects
Ad
From The CircuitryVerified tech news, cross-checked.How we verify →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Return has reportedly secured €835 million in financing underwritten by Deutsche Bank and Rabobank for battery storage in Germany. The framework covers three projects under construction, totaling 117 MW. The company aims to install at least 1 GW a year in Germany from 2027.

Energy storage company Return has reportedly secured €835 million, about $936 million, in portfolio financing underwritten by Deutsche Bank and Rabobank for battery storage in Germany. The report does not say every project in the pipeline has reached financial close.
The new financing framework covers three battery storage projects under construction in Germany, with a combined capacity of 117 MW.
The new financing framework covers three battery storage projects under construction in Germany, with a combined capacity of 117 MW. The report says that, assuming four-hour batteries running two full cycles a day, the sites could discharge enough electricity in a year to match the use of about 100,000 German households. That household figure is an assumption in the report, not a measured output. More projects are expected to join the framework through 2027 as they move toward financial close.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →
Return is aiming at a larger build after that. The company reportedly wants to install at least 1 GW of battery storage a year in Germany beginning in 2027. It put planned annual investment at €750 million to €1.2 billion, depending on market conditions. The report describes Return as an Amsterdam company founded in 2021 that builds, owns, and operates large storage sites.

The banks framed the loan as a scaling tool. Dominik Thumfart, Deutsche Bank's head of infrastructure and energy origination, said battery storage helps optimize intermittent plants and support grid stability, and that the structure is built to meet the capital spending needs of Return's German project pipeline. Daniel Witvoet, Return's CFO, said the company needs to scale how it finances storage as well as the batteries themselves.
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
The report ties the plan to Germany's wind and solar mix. It says the expansion comes as those sources create a need for more flexibility. It does not name the three project sites, a first power date, or a battery supplier.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inEnergy
  • Statnett pauses new data-center grid reservations until 2027

    Energy · 4d
  • A report says a 31 megawatt solar farm in Australia is at full output

    Energy · 4d
  • A report says Latvia's 174 megawatt Tume solar farm is operating

    Energy · 4d
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
Ad
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Energy →
  • Energy·Nov 13

    IEA says the oil market returns to a surplus this quarter

    The IEA's November report says global oil supply has moved above demand for the first time since the war in Iran began. It expects a surplus in the fourth quarter of 2026 and a larger build in 2027.

  • Energy·Nov 13

    Archrock agrees to buy HiVolt for up to $450 million

    Archrock has agreed to acquire HiVolt Energy Holdings in an all-cash deal the companies value at up to $450 million. The filing sets a $415 million cash price at close, plus an employee incentive plan of up to $35 million, and expects the merger in the first quarter of 2027.

  • Energy·Nov 13

    Rowan adds more than $1.5 billion in data center financing

    Rowan Digital Infrastructure has added more than $1.5 billion in corporate financing for its U.S. data center pipeline. The capital is for early work across 5.5 gigawatts, and more than 1.2 gigawatts is already under contract.

  • Energy·Nov 12

    EIA forecasts Alaskan crude oil production to grow 13% in 2027

    The EIA forecasts Alaskan crude oil production will rise 13% in 2027, to 505,000 barrels a day, the most since 2014.

  • Energy·Nov 10

    NRC issues first gas-cooled reactor permit in nearly 60 years

    NRC has granted Long Mott Energy a construction permit for a station in Calhoun County, Texas, and says a high-temperature gas-cooled reactor has not received one in nearly 60 years.