The Circuitry
THE CIRCUITRYYour one-stop source for all tech news
HOMETODAYNEWSFEEDEVENTS
BOOKMARKS
RSS
© 2026 The Circuitry
About UsSourcesContactCorrectionsPrivacy
  • Today
  • Feed
  • Events
  • Saved
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL
  • AAPL
  • MSFT
  • GOOGL
  • META
  • NVDA
  • TSLA
  • AMZN
  • INTC
  • SONY
  • TTWO
  • COIN
  • BTC
  • ETH
  • SOL

Feed

Ad

Verified tech news, cross-checked.

  • Phantom Blade Zero PC Pre-Load Opens Tonight at 7 PM PDT, Needs 300 GB FreeGaming
  • Microsoft offers voluntary exit to about 60,000 employeesTech
  • Apple's iPad mini gets 8.5-inch OLED, A20 Pro and IP67, from $699Tech
  • Anthropic files S-1 for proposed IPO, plans Nasdaq listing as ANTTech
  • Schneider, NVIDIA and HPE introduce edge AI agents for process industriesTech
  • Micro1 plans $1 billion spend on workplace data for AI trainingTech
  • NASA plans 2028 moon landing with SpaceX and Blue OriginTech
  • Musk Says SpaceX Closed $40 Billion of Debt for GPUs, Mostly CallableTech
Scroll for more
Verification
VERIFIEDConfidence: HIGH
Source identified
Claims cross-referenced
No discrepancies found
Sourcing
1source

via PCMag

From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Home/Tech/Verizon CEO: SpaceX Would Need 4-6+ Years, $300B-$500B to Build a Network
VERIFIEDBy Xavier Rivera·Monday, October 26, 2026 at 12:24 PM AST·2.5 min read

Verizon CEO: SpaceX Would Need 4-6+ Years, $300B-$500B to Build a Network

On Verizon's Q3 call on Oct 26, CEO Dan Schulman said that if SpaceX builds a terrestrial network, which Bloomberg reported on Oct 22 it wants at least 80,000 sites for, it would take "a minimum of four to six years". By his own assumption it would cost $300 billion to $500 billion over seven or eight years. He said that would make SpaceX the "sixth, not the fourth" competitor, and that Verizon sees "absolutely no benefit" in an MVNO deal for any satellite provider. These are a rival CEO's estimates, not SpaceX plans; SpaceX has said it will turn on Starlink Mobile in early 2028.

Source:PCMag
Post
Verizon CEO: SpaceX Would Need 4-6+ Years, $300B-$500B to Build a Network
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
TL;DRAI · 60 sec read

Verizon's CEO estimates SpaceX would need at least 4-6 years to build a terrestrial network, at $300B-$500B by his own assumption. It's a rival's estimate, not a SpaceX plan.

Verizon CEO Dan Schulman said on the company's Q3 earnings call on Oct 26 that if SpaceX builds its own terrestrial wireless network, it would take "a minimum of four to six years" to build it out. These are a rival CEO's estimates, not SpaceX plans.

The conditions he set

Schulman framed the estimate as conditional. "If they build one, they're going to look at 65,000-80,000 macro sites," he said, adding that it would take a minimum of four to six years "assuming that's the case, and assuming they try to go do that." He also said he operates "under the assumption that everything SpaceX says they will do, they will do, and that they will execute flawlessly."

The cost estimate

On cost, Schulman said "I assume somewhere between $300 billion and half a trillion over the next like seven or eight years." That is his own back-of-envelope assumption, not a Verizon filing, and neither SpaceX nor an independent analyst has endorsed it. Reuters' summary of the Bloomberg report cited a TD Cowen estimate of more than $80 billion for a nationwide terrestrial network, several times lower.

"Sixth, not the fourth"

Schulman said that over the next four to six years SpaceX "[has] the possibility of becoming the sixth, not the fourth, the sixth competitor in the market," and that at that point he would "welcome the opportunity to compete against them." He noted that Verizon already competes against three rivals, two of which offer free wireless service. It is a possibility he described, not a prediction.
From The CircuitryThe Feed — live briefs across tech, all day.See what’s happening →

No MVNO for satellite providers

Asked by an analyst about a possible MVNO deal, Schulman said "there are no back doors to any of our MVNO agreements, and I see absolutely no benefit whatsoever to extending an MVNO deal to any satellite provider." That is the CEO's stated view, not a formal contract position.

Context

Bloomberg reported on Oct 22, citing people familiar with the matter, that SpaceX aims to secure at least 80,000 cell sites across the US and is in talks with at least one major infrastructure company, including Crown Castle. SpaceX has not confirmed the figure. See our earlier coverage: SpaceX seeks access to 80,000 US cell sites and SpaceX agrees to buy 800 MHz spectrum for Starlink Mobile.

On SpaceX's Q3 call on Oct 20, Gwynne Shotwell said the company would turn on Starlink Mobile service in early 2028. SpaceX has not published a cost or timeline for a ground network. Reuters reported that carrier stocks fell 4-5% after the Bloomberg report.
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →
Source: PCMag, Verizon Q3 2026 earnings call transcript.
Why this mattersAI · ~100 words

Tap a lens to see what this story means for you.

Morning Brief

Liked this? The Brief brings you the whole day in tech, verified, every morning.

Two minutes, free forever. What's in The Brief →

Reader-supported
DonateBuy me a coffee →Follow@thecircuitry_ →Follow@thecircuitry.to →
HELP US IMPROVE
From The Circuitry

See what’s happening right now

The Feed runs all day — short, verified briefs the moment they break.

Open the Feed →
From The Circuitry

Follow @thecircuitry_

Every story we publish, as it happens. No noise between.

Follow on X ↗On Bluesky ↗

Reader-supported

The Circuitry is a passion project I've always wanted to build, and I love the work behind it.

Running it costs real money. APIs, hosting, time. To keep improving the site and growing this into something useful for everyone, those costs have to be covered.

Any contribution is appreciated. If not, no pressure. Thanks for reading.

Buy me a coffee
More inTech
  • Micro1 plans $1 billion spend on workplace data for AI training

    Tech · 8h
  • NASA plans 2028 moon landing with SpaceX and Blue Origin

    Tech · 15h
  • Musk Says SpaceX Closed $40 Billion of Debt for GPUs, Mostly Callable

    Tech · 20h
SupportThe Work

The Circuitry is reader-supported. If you find the daily brief useful, you can buy me a coffee to keep it going.

Buy a coffee →
From The CircuitryWhy The Circuitry

Verified tech news, cross-checked.

Every story is checked against independent sources before it posts — no rumors dressed up as fact.

How we verify →

MORE IN THIS BEAT

All Tech →
  • Tech·Oct 26

    Phantom Blade Zero PC Pre-Load Opens Tonight at 7 PM PDT, Needs 300 GB Free

    Phantom Blade Zero's PC pre-load opens October 26 at 7:00 PM PDT (10 PM AST), per the game's official X account, which says the game is about 145 GB and asks players to reserve at least 300 GB of free SSD space for the pre-load. The game unlocks October 28 at 7:00 PM PDT (October 29, 10 AM Beijing) for everyone at once, on PS5 and PC.

  • Tech·Oct 26

    Microsoft offers voluntary exit to about 60,000 employees

    Microsoft on Monday announced a new Voluntary Exit Offer for eligible employees in participating teams in the US, Canada, India and the UK at level 70 and below. Chief People Officer Amy Coleman's memo says it "builds on what we learned" from April's Voluntary Retirement Program. About 60,000 people, roughly a quarter of its 223,000 staff, are eligible, the company told GeekWire. A person familiar told CNBC that employees decide in December and leave Dec. 31. Some groups, including sales, aren't participating, and Microsoft says the offer doesn't replace layoffs.

  • Tech·Oct 26

    Apple's iPad mini gets 8.5-inch OLED, A20 Pro and IP67, from $699

    Apple unveiled the new iPad mini on Oct 26. It has an 8.5-inch OLED display (nano-texture optional), the A20 Pro chip, a 5.4 mm IP67 body, a landscape-edge Center Stage camera and N1 with Wi-Fi 7 and Bluetooth 6. It starts at $699 for Wi-Fi and $849 for Wi-Fi + Cellular, runs iPadOS 27, and the $79 TechWoven Smart Folio launches with it. Pre-orders open Wednesday Oct 28 (MacRumors: 10:10 a.m. PT, 1:10 p.m. AST), with availability Nov 6. It arrived days before Apple's "Pro and tell" media event, per The Verge.

  • Tech·Oct 26

    Anthropic files S-1 for proposed IPO, plans Nasdaq listing as ANT

    Anthropic, PBC filed a Form S-1 with the SEC on Oct 26 for a proposed IPO of its Class A common stock, which it intends to list on Nasdaq as "ANT". The share count and price range are not set, and the registration statement has not yet become effective. The filing reports $16.3B revenue and an $80.7B net loss (mostly a $72.4B non-cash fair-value charge) for the six months ended June 30, 2026, and describes its PBC and Long-Term Benefit Trust governance.

  • Tech·Oct 26

    Schneider, NVIDIA and HPE introduce edge AI agents for process industries

    Schneider Electric, NVIDIA and HPE announced a collaboration on Oct 21 introducing Industrial AI Agents at the Edge: OT-monitoring, cybersecurity and energy-optimization agents that run on HPE Private Cloud AI and are managed through Schneider's EcoStruxure Industrial Insights apps. The release gives no availability date; CMPC Chile is cited as a three-year user of Schneider's OTMS monitoring that the agents would build on.